The tools

22 electrical calculation and reference tools for systems 600 V and below. Watch the current v0.36 demonstrations with Stinger Pro Girl. Each tool has its own page; 21 tools support PDF reports, while Fuse Charts is a lookup without a PDF.

The tools
Share this pageEmail

All 22 app tools

Browse the complete series, or watch all 22 narrated demonstrations.

  1. Pull Tension

    Plan pulling tension, sidewall pressure, and the direction of the pull. Preserve the displayed cautions.

  2. Solar PV

    Compare string voltage with equipment limits and review the field conditions still needing confirmation.

  3. Feeder Sizing

    Review conductor sizing, voltage drop, parallel sets, and equipment grounding together.

  4. Pull Box

    Follow pull-box sizing, bending-space considerations, and knockout layout.

  5. Conduit Fill

    Compare raceway fill and conductor jamming considerations with a scaled cross-section.

  6. Feeder Tap

    See the feeder tap rule and the conditions that apply to the demonstrated arrangement.

  7. Grounding and Bonding

    Distinguish bonding jumpers, grounding electrode conductors, and electrode-specific rules.

  8. Fire Pump

    Follow the fire-pump example through protection, conductors, and voltage-drop checks.

  9. Service

    Review the service example, protection, bonding, grounding, and applicable qualifications.

  10. Knockout Layout

    See hole centers, fitting clearances, and a dimensioned layout for the box.

  11. Wireway

    Review wireway fill, conductor bending space, and the arrangement drawn to scale.

  12. Motors

    Follow the motor circuit example through conductor sizing and protection.

  13. Electrical Safety

    Review shock boundaries, table-method conditions, and a job briefing record. Training and site procedures still apply.

  14. Cords

    Decode cord ratings and review the sizing result, including a result with no remaining margin.

  15. Transformer

    Follow the transformer example through protection, conductors, and grounding.

  16. Generator

    Find a current-sized generator candidate and review transfer-switch bonding. Load kW still needs verification.

  17. Fault Current

    Follow available fault current through the service and branch, keeping different fault quantities distinct.

  18. Duct Bank

    Plan concrete volume and spacer positions, and keep the flotation warning in view.

  19. Code Finder

    Find plain-language pointers to 2026 NEC sections. Read the cited code and its conditions.

  20. Installation Standards

    Explore NECA 1-2023 workmanship summaries and drawings, separate from mandatory adopted code.

  21. Code Reference

    Browse rules, tables, drawings, safety topics, and the 2026 edition notice.

  22. Fuse Charts

    Look up UL fuse classes across manufacturers. Check application ratings before substituting a fuse; no PDF report.

Two free calculators

A motor calculator and a code reference, here in the browser.

Motor Calculator — NEC Article 430 (3-phase)

Full-load current from Table 430.250, with branch conductor, protection, and grounding.

FLC per NEC Table 430.250 (3-phase induction). Branch conductor at 125% FLC (430.22) from the 75°C copper column; maximum inverse-time-breaker protection at 250% FLC (430.52); EGC per 250.122. Verify motor nameplate and design type.

For estimating and reference only. These calculators are provided as a convenience and demonstration. They do not replace engineering judgment. Always verify against the current adopted edition of the NEC (NFPA 70), manufacturer data, and your local authority having jurisdiction (AHJ) before designing or installing.

Stinger Pro Girl